How to Measure for a Glass Railing (Without Costly Mistakes)

Toughened glass cannot be cut or drilled after tempering. A measurement error means a whole new panel. Here is how to get it right the first time.
Before you measure
- Finish the floor first — measure from the final finished level, not the slab
- Decide the mounting method (core-drill or base-plate) — it changes panel height
- Confirm your required railing height
Step 1: Measure the run
Measure the total length at three points — start, middle and end. Walls and slabs are rarely perfectly straight. Use the smallest measurement for planning.
Step 2: Plan panel splits
Divide the run into panels of a manageable size. Very large panels are heavy, expensive and hard to handle on site. Leave a consistent gap between panels and at each end — your fabricator will specify the exact gap.
Step 3: Work out panel height
Panel height = required railing height − the amount of glass gripped inside the spigot. Every spigot model differs, so get this figure from the spigot spec before ordering glass.
Step 4: Mark spigot positions
Space spigots evenly per the design, keeping them a set distance from each panel edge (never right at the corner). Check for rebar or services before core-drilling.
Step 5: Check level and plumb
Confirm the floor is level along the run. A sloping floor means either stepped panels or a visible taper — better to discover this before ordering.
The five costly mistakes
- Measuring before flooring is laid
- Measuring at only one point
- Forgetting the glass depth inside the spigot
- Ignoring panel gaps
- Ordering glass before confirming spigot specs
Send us your measurements and we will confirm hardware and glass sizing before anything is cut.
Need this for a project?
Get steel, glass hardware and PVD finishes cut to your exact spec — fast quotes from Bengaluru.
Get a Free Quote →


